Govt. Center Batavia Riverwa
AvailableEV charging station in Batavia, Illinois on the ChargePoint network — 2 Level 2. US DOE AFDC station 89797.
At a glance
Govt. Center Batavia Riverwa is a public EV charging station at 100 N Island Ave in Batavia, Illinois, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 27, 2017.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 89797 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 27, 2017 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 100 N Island Ave
- City
- Batavia
- State
- Illinois
- ZIP
- 60510
- Coordinates
- 41.85191, -88.30891
Within ~15 km
Nearby charging
- Hanover Park Il Sdc110 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Tower Station EV Lot12 ports
Red E · Temporarily unavailable
- Fair Oak Ford - LVL 210 ports
Blink · Available
What kind of charging does Govt. Center Batavia Riverwa offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Illinois average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Govt. Center Batavia Riverwa compare with other stations in Batavia?
Batavia has 6 charging stations in the DOE registry with 16 ports. Govt. Center Batavia Riverwa accounts for 13% of the charging ports in Batavia. It is the only ChargePoint station in Batavia. Statewide, Illinois has 2,056 stations and 7,047 ports, the 14th-largest station count of the 51 states and DC. The biggest station in Illinois, Hanover Park Il Sdc in Hanover Park, has 110 ports.
Who operates Govt. Center Batavia Riverwa?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 942 of those stations are in Illinois, 46% of the state's 2,056.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 27, 2017, one of 37 stations in Illinois with a 2017 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Govt. Center Batavia Riverwa have?
Govt. Center Batavia Riverwa has 2 charging ports: 2 Level 2.
Does Govt. Center Batavia Riverwa have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Govt. Center Batavia Riverwa have?
Govt. Center Batavia Riverwa has J1772 connectors.
Is Govt. Center Batavia Riverwa open to the public?
Yes. Govt. Center Batavia Riverwa is listed with public access, and its status is available.
Where is Govt. Center Batavia Riverwa?
Govt. Center Batavia Riverwa is at 100 N Island Ave, Batavia, IL 60510. Its coordinates are 41.85191, -88.30891.
More EV charging around Batavia
Working with Illinois charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 89797, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Govt. Center Batavia Riverwa, Batavia, IL (AFDC station 89797)”, https://chargecensus.com/stations/illinois/govt-center-batavia-riverwa-89797 (data as of October 12, 2026).