Gcdj Power Link 1
AvailableEV charging station in Gurnee, Illinois on the ChargePoint network — 2 DC fast. US DOE AFDC station 374027.
At a glance
Gcdj Power Link 1 is a public EV charging station at 7255 Grand Ave in Gurnee, Illinois, on the ChargePoint network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Dec 18, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 374027 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 18, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 7255 Grand Ave
- City
- Gurnee
- State
- Illinois
- ZIP
- 60031
- Coordinates
- 42.38500, -87.98367
Within ~15 km
Nearby charging
- Naval Station Great Lakes31 ports
Non-networked · Available
Tesla Supercharger · Available
Non-networked · Available
Non-networked · Available
- Hawthorne Row Parking Garage10 ports
Non-networked · Available
Non-networked · Available
What kind of charging does Gcdj Power Link 1 offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 42% below the Illinois average of 3.4 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Gcdj Power Link 1 compare with other stations in Gurnee?
Gurnee has 9 charging stations in the DOE registry with 24 ports. Gcdj Power Link 1 accounts for 8% of the charging ports in Gurnee. ChargePoint runs 6 stations in Gurnee. Statewide, Illinois has 2,056 stations and 7,047 ports, the 14th-largest station count of the 51 states and DC. The biggest station in Illinois, Hanover Park Il Sdc in Hanover Park, has 110 ports.
Who operates Gcdj Power Link 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 942 of those stations are in Illinois, 46% of the state's 2,056.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 18, 2024, one of 277 stations in Illinois with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Gcdj Power Link 1 have?
Gcdj Power Link 1 has 2 charging ports: 2 DC fast.
Does Gcdj Power Link 1 have DC fast charging?
Yes. The registry lists 2 DC fast ports at Gcdj Power Link 1, with CCS connectors.
What connectors does Gcdj Power Link 1 have?
Gcdj Power Link 1 has CCS connectors.
Is Gcdj Power Link 1 open to the public?
Yes. Gcdj Power Link 1 is listed with public access, and its status is available.
Where is Gcdj Power Link 1?
Gcdj Power Link 1 is at 7255 Grand Ave, Gurnee, IL 60031. Its coordinates are 42.38500, -87.98367.
More EV charging around Gurnee
Working with Illinois charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 374027, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Gcdj Power Link 1, Gurnee, IL (AFDC station 374027)”, https://chargecensus.com/stations/illinois/gcdj-power-link-1-374027 (data as of October 12, 2026).