ChargeCensus

Dupage Co Dupage Care 2

Available

EV charging station in Wheaton, Illinois on the ChargePoint network — 2 Level 2. US DOE AFDC station 454111.

At a glance

Dupage Co Dupage Care 2 is a public EV charging station at 400 N County Farm Rd in Wheaton, Illinois, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Apr 1, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID454111
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 1, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
400 N County Farm Rd
City
Wheaton
ZIP
60187
Coordinates
41.86612, -88.14538

Within ~15 km

Nearby charging

What kind of charging does Dupage Co Dupage Care 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Illinois average of 3.4 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; NACS (Tesla), the North American Charging Standard connector.

How does Dupage Co Dupage Care 2 compare with other stations in Wheaton?

Wheaton has 8 charging stations in the DOE registry with 20 ports. Dupage Co Dupage Care 2 accounts for 10% of the charging ports in Wheaton. ChargePoint runs 4 stations in Wheaton. Statewide, Illinois has 2,056 stations and 7,047 ports, the 14th-largest station count of the 51 states and DC. The biggest station in Illinois, Hanover Park Il Sdc in Hanover Park, has 110 ports.

Who operates Dupage Co Dupage Care 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 942 of those stations are in Illinois, 46% of the state's 2,056.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 1, 2026, one of 314 stations in Illinois with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Dupage Co Dupage Care 2 have?

Dupage Co Dupage Care 2 has 2 charging ports: 2 Level 2.

Does Dupage Co Dupage Care 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Dupage Co Dupage Care 2 have?

Dupage Co Dupage Care 2 has J1772 and NACS (Tesla) connectors.

Is Dupage Co Dupage Care 2 open to the public?

Yes. Dupage Co Dupage Care 2 is listed with public access, and its status is available.

Where is Dupage Co Dupage Care 2?

Dupage Co Dupage Care 2 is at 400 N County Farm Rd, Wheaton, IL 60187. Its coordinates are 41.86612, -88.14538.

More EV charging around Wheaton

Working with Illinois charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 454111, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Dupage Co Dupage Care 2, Wheaton, IL (AFDC station 454111)”, https://chargecensus.com/stations/illinois/dupage-co-dupage-care-2-454111 (data as of October 12, 2026).