ChargeCensus

CBBEL Office Phase 2

Available

EV charging station in Rosemont, Illinois on the EVmatch network — 16 Level 2. US DOE AFDC station 375179.

At a glance

CBBEL Office Phase 2 is a public EV charging station at 9575 W Higgins Rd Ste 600 in Rosemont, Illinois, on the EVmatch network. It has 16 charging ports (16 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 27, 2024.

Total ports
16
DC fast
0
Level 2
16
Access
Public
workplace charging
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID375179
NetworkEVmatch
StatusAvailable (E)
AccessPublic
FacilityOffice building
Open dateNov 27, 2024
Last updated at sourceJul 15, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.20 per kWh

Charging network

EVmatch

Operates 63 stations in the DOE registry — view the full network →

Location

Address
9575 W Higgins Rd Ste 600
City
Rosemont
ZIP
60018
Coordinates
41.99279, -87.86505

Within ~15 km

Nearby charging

What kind of charging does CBBEL Office Phase 2 offer?

Of its 16 ports, 16 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 4.7 times the Illinois average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.20 per kWh”. The site is listed as a office building location. It is flagged as workplace charging.

How does CBBEL Office Phase 2 compare with other stations in Rosemont?

Rosemont has 9 charging stations in the DOE registry with 60 ports. CBBEL Office Phase 2 accounts for 27% of the charging ports in Rosemont. EVmatch runs 2 stations in Rosemont. Statewide, Illinois has 2,056 stations and 7,047 ports, the 14th-largest station count of the 51 states and DC. The biggest station in Illinois, Hanover Park Il Sdc in Hanover Park, has 110 ports.

Who operates CBBEL Office Phase 2?

EVmatch operates 63 stations in the registry across 12 states, with 240 Level 2 ports in total. 10 of those stations are in Illinois, under 1% of the state's 2,056. By port count this is the 2nd-biggest EVmatch station in the country.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 27, 2024, one of 277 stations in Illinois with a 2024 open date. The station's record was last updated at the source on Jul 15, 2026.

Frequently asked questions

How many chargers does CBBEL Office Phase 2 have?

CBBEL Office Phase 2 has 16 charging ports: 16 Level 2.

Does CBBEL Office Phase 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 16 ports are all Level 2.

What connectors does CBBEL Office Phase 2 have?

CBBEL Office Phase 2 has J1772 connectors.

Is charging at CBBEL Office Phase 2 free?

Pricing as reported to the DOE registry: $0.20 per kWh.

Is CBBEL Office Phase 2 open to the public?

Yes. CBBEL Office Phase 2 is listed with public access, and its status is available.

Where is CBBEL Office Phase 2?

CBBEL Office Phase 2 is at 9575 W Higgins Rd Ste 600, Rosemont, IL 60018. Its coordinates are 41.99279, -87.86505.

More EV charging around Rosemont

Working with Illinois charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 375179, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “CBBEL Office Phase 2, Rosemont, IL (AFDC station 375179)”, https://chargecensus.com/stations/illinois/cbbel-office-phase-2-375179 (data as of October 12, 2026).