CAH&C Parking Lot
AvailableEV charging station in Carlinville, Illinois on the ChargeLab network — 2 Level 2. US DOE AFDC station 455844.
At a glance
CAH&C Parking Lot is a public EV charging station at 20613 North Broad St in Carlinville, Illinois, on the ChargeLab network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 18, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 455844 |
| Network | ChargeLab |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 18, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 20613 North Broad St
- City
- Carlinville
- State
- Illinois
- ZIP
- 62626
- Coordinates
- 39.29967, -89.88316
Within ~15 km
Nearby charging
- Mjmelectric Shipman Rd2 ports
ChargePoint · Available
What kind of charging does CAH&C Parking Lot offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Illinois average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does CAH&C Parking Lot compare with other stations in Carlinville?
Carlinville has 2 charging stations in the DOE registry with 4 ports. CAH&C Parking Lot accounts for 50% of the charging ports in Carlinville. It is the only ChargeLab station in Carlinville. Statewide, Illinois has 2,056 stations and 7,047 ports, the 14th-largest station count of the 51 states and DC. The biggest station in Illinois, Hanover Park Il Sdc in Hanover Park, has 110 ports.
Who operates CAH&C Parking Lot?
ChargeLab operates 406 stations in the registry across 38 states, with 325 DC fast and 1,312 Level 2 ports in total. 5 of those stations are in Illinois, under 1% of the state's 2,056.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 18, 2026, one of 314 stations in Illinois with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does CAH&C Parking Lot have?
CAH&C Parking Lot has 2 charging ports: 2 Level 2.
Does CAH&C Parking Lot have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does CAH&C Parking Lot have?
CAH&C Parking Lot has J1772 connectors.
Is CAH&C Parking Lot open to the public?
Yes. CAH&C Parking Lot is listed with public access, and its status is available.
Where is CAH&C Parking Lot?
CAH&C Parking Lot is at 20613 North Broad St, Carlinville, IL 62626. Its coordinates are 39.29967, -89.88316.
More EV charging around Carlinville
Working with Illinois charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 455844, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “CAH&C Parking Lot, Carlinville, IL (AFDC station 455844)”, https://chargecensus.com/stations/illinois/cah-c-parking-lot-455844 (data as of October 12, 2026).