ChargeCensus

801 W Dundee Rd

Available

EV charging station in Arlington Heights, Illinois on the EV Connect network — 4 DC fast · 4 Level 2. US DOE AFDC station 349205.

At a glance

801 W Dundee Rd is a public EV charging station at 801 W Dundee Rd in Arlington Heights, Illinois, on the EV Connect network. It has 8 charging ports (4 DC fast · 4 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Jun 26, 2024.

Total ports
8
DC fast
4
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID349205
NetworkEV Connect
StatusAvailable (E)
AccessPublic
Open dateJun 26, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EV Connect

Operates 1,601 stations in the DOE registry — view the full network →

Location

Address
801 W Dundee Rd
City
Arlington Heights
ZIP
60004
Coordinates
42.13834, -87.99160

Within ~15 km

Nearby charging

What kind of charging does 801 W Dundee Rd offer?

Of its 8 ports, 4 are DC fast and 4 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.3 times the Illinois average of 3.4 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.

How does 801 W Dundee Rd compare with other stations in Arlington Heights?

Arlington Heights has 9 charging stations in the DOE registry with 26 ports. 801 W Dundee Rd accounts for 31% of the charging ports in Arlington Heights. It is the only EV Connect station in Arlington Heights. Statewide, Illinois has 2,056 stations and 7,047 ports, the 14th-largest station count of the 51 states and DC. The biggest station in Illinois, Hanover Park Il Sdc in Hanover Park, has 110 ports.

Who operates 801 W Dundee Rd?

EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 39 of those stations are in Illinois, 2% of the state's 2,056.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 26, 2024, one of 277 stations in Illinois with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 801 W Dundee Rd have?

801 W Dundee Rd has 8 charging ports: 4 DC fast · 4 Level 2.

Does 801 W Dundee Rd have DC fast charging?

Yes. The registry lists 4 DC fast ports at 801 W Dundee Rd, with CCS connectors.

What connectors does 801 W Dundee Rd have?

801 W Dundee Rd has J1772 and CCS connectors.

Is 801 W Dundee Rd open to the public?

Yes. 801 W Dundee Rd is listed with public access, and its status is available.

Where is 801 W Dundee Rd?

801 W Dundee Rd is at 801 W Dundee Rd, Arlington Heights, IL 60004. Its coordinates are 42.13834, -87.99160.

More EV charging around Arlington Heights

Working with Illinois charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 349205, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “801 W Dundee Rd, Arlington Heights, IL (AFDC station 349205)”, https://chargecensus.com/stations/illinois/801-w-dundee-rd-349205 (data as of October 12, 2026).