ChargeCensus

Riverside Hotel

Available

EV charging station in Garden City, Idaho on the Blink network — 7 Level 2. US DOE AFDC station 233230.

At a glance

Riverside Hotel is a public EV charging station at 2900 West Chinden Boulevard in Garden City, Idaho, on the Blink network. It has 7 charging ports (7 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 25, 2021.

Total ports
7
DC fast
0
Level 2
7
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID233230
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateAug 25, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.00-$0.25/kWh Variable Energy Fee

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
2900 West Chinden Boulevard
City
Garden City
State
Idaho
ZIP
83714
Coordinates
43.61991, -116.23397

Within ~15 km

Nearby charging

What kind of charging does Riverside Hotel offer?

Of its 7 ports, 7 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.4 times the Idaho average of 2.9 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.00-$0.25/kWh Variable Energy Fee”.

How does Riverside Hotel compare with other stations in Garden City?

Garden City has 1 charging station in the DOE registry with 7 ports. It is the only Blink station in Garden City. Statewide, Idaho has 293 stations and 852 ports, the 43rd-largest station count of the 51 states and DC. The biggest station in Idaho, AC Element Hotel Boise Downtown in Boise, has 18 ports.

Who operates Riverside Hotel?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 63 of those stations are in Idaho, 22% of the state's 293.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 25, 2021, one of 29 stations in Idaho with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Riverside Hotel have?

Riverside Hotel has 7 charging ports: 7 Level 2.

Does Riverside Hotel have DC fast charging?

No. The registry lists no DC fast ports here; its 7 ports are all Level 2.

What connectors does Riverside Hotel have?

Riverside Hotel has J1772 connectors.

Is charging at Riverside Hotel free?

Pricing as reported to the DOE registry: $0.00-$0.25/kWh Variable Energy Fee.

Is Riverside Hotel open to the public?

Yes. Riverside Hotel is listed with public access, and its status is available.

Where is Riverside Hotel?

Riverside Hotel is at 2900 West Chinden Boulevard, Garden City, ID 83714. Its coordinates are 43.61991, -116.23397.

More EV charging around Garden City

Working with Idaho charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 233230, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Riverside Hotel, Garden City, ID (AFDC station 233230)”, https://chargecensus.com/stations/idaho/riverside-hotel-233230 (data as of October 12, 2026).