ChargeCensus

Elevation Charger #4

Available

EV charging station in Washington, District of Columbia on the ChargePoint network — 2 Level 2. US DOE AFDC station 355497.

At a glance

Elevation Charger #4 is a public EV charging station at 100 Florida Ave NE in Washington, District of Columbia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 12, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID355497
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 12, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
100 Florida Ave NE
ZIP
20002
Coordinates
38.90894, -77.00360

Within ~15 km

Nearby charging

What kind of charging does Elevation Charger #4 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% below the District of Columbia average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Elevation Charger #4 compare with other stations in Washington?

Washington has 392 charging stations in the DOE registry with 1,365 ports, the most of 4 cities and towns in District of Columbia. Elevation Charger #4 accounts for under 1% of the charging ports in Washington. ChargePoint runs 91 stations in Washington. Statewide, District of Columbia has 396 stations and 1,386 ports, the 38th-largest station count of the 51 states and DC. The biggest station in District of Columbia, Washington, DC - Wisconsin Avenue (Floor G3, G4) - Tesla Destination in Washington, has 34 ports.

Who operates Elevation Charger #4?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 91 of those stations are in District of Columbia, 23% of the state's 396.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 12, 2024, one of 33 stations in District of Columbia with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Elevation Charger #4 have?

Elevation Charger #4 has 2 charging ports: 2 Level 2.

Does Elevation Charger #4 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Elevation Charger #4 have?

Elevation Charger #4 has J1772 connectors.

Is Elevation Charger #4 open to the public?

Yes. Elevation Charger #4 is listed with public access, and its status is available.

Where is Elevation Charger #4?

Elevation Charger #4 is at 100 Florida Ave NE, Washington, DC 20002. Its coordinates are 38.90894, -77.00360.

More EV charging around Washington

Working with District of Columbia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 355497, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Elevation Charger #4, Washington, DC (AFDC station 355497)”, https://chargecensus.com/stations/district-of-columbia/elevation-charger-4-355497 (data as of October 12, 2026).