ChargeCensus

1200 17th Street NW

Available

EV charging station in Washington, District of Columbia on the Blink network — 5 Level 2. US DOE AFDC station 148393.

At a glance

1200 17th Street NW is a public EV charging station at 1200 17th Street, NW in Washington, District of Columbia, on the Blink network. It has 5 charging ports (5 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 5, 2014.

Total ports
5
DC fast
0
Level 2
5
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID148393
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateNov 5, 2014
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: FREE

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
1200 17th Street, NW
ZIP
20036
Coordinates
38.90575, -77.03871

Within ~15 km

Nearby charging

What kind of charging does 1200 17th Street NW offer?

Of its 5 ports, 5 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 43% above the District of Columbia average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “FREE”.

How does 1200 17th Street NW compare with other stations in Washington?

Washington has 392 charging stations in the DOE registry with 1,365 ports, the most of 4 cities and towns in District of Columbia. 1200 17th Street NW accounts for under 1% of the charging ports in Washington. Blink runs 122 stations in Washington. Statewide, District of Columbia has 396 stations and 1,386 ports, the 38th-largest station count of the 51 states and DC. The biggest station in District of Columbia, Washington, DC - Wisconsin Avenue (Floor G3, G4) - Tesla Destination in Washington, has 34 ports.

Who operates 1200 17th Street NW?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 122 of those stations are in District of Columbia, 31% of the state's 396.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 5, 2014, one of 5 stations in District of Columbia with a 2014 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 1200 17th Street NW have?

1200 17th Street NW has 5 charging ports: 5 Level 2.

Does 1200 17th Street NW have DC fast charging?

No. The registry lists no DC fast ports here; its 5 ports are all Level 2.

What connectors does 1200 17th Street NW have?

1200 17th Street NW has J1772 connectors.

Is charging at 1200 17th Street NW free?

Pricing as reported to the DOE registry: FREE.

Is 1200 17th Street NW open to the public?

Yes. 1200 17th Street NW is listed with public access, and its status is available.

Where is 1200 17th Street NW?

1200 17th Street NW is at 1200 17th Street, NW, Washington, DC 20036. Its coordinates are 38.90575, -77.03871.

More EV charging around Washington

Working with District of Columbia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 148393, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “1200 17th Street NW, Washington, DC (AFDC station 148393)”, https://chargecensus.com/stations/district-of-columbia/1200-17th-street-nw-148393 (data as of October 12, 2026).