First State Chevrolet
Temporarily unavailableEV charging station in Georgetown, Delaware on the EV Connect network — 2 DC fast. US DOE AFDC station 261139.
At a glance
First State Chevrolet is a public EV charging station at 22694 Dupont Blvd in Georgetown, Delaware, on the EV Connect network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as temporarily unavailable, open since May 20, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 261139 |
| Network | EV Connect |
| Status | Temporarily unavailable (T) |
| Access | Public |
| Open date | May 20, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 22694 Dupont Blvd
- City
- Georgetown
- State
- Delaware
- ZIP
- 19947
- Coordinates
- 38.67069, -75.38646
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Weston Willows6 ports
Blink · Available
Blink · Available
- Boulevard Ford - DCFC4 ports
Blink · Available
- Dtcc Owens Station 12 ports
ChargePoint · Available
- State Of De Scfc 22 ports
ChargePoint · Available
What kind of charging does First State Chevrolet offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 35% below the Delaware average of 3.1 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does First State Chevrolet compare with other stations in Georgetown?
Georgetown has 7 charging stations in the DOE registry with 22 ports, the 12th-most of 33 cities and towns in Delaware. First State Chevrolet accounts for 9% of the charging ports in Georgetown. It is the only EV Connect station in Georgetown. Statewide, Delaware has 267 stations and 825 ports, the 44th-largest station count of the 51 states and DC. The biggest station in Delaware, New Castle, DE - Airport Road - Tesla Supercharger in New Castle, has 16 ports.
Who operates First State Chevrolet?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 4 of those stations are in Delaware, 1% of the state's 267.
What does the “Temporarily unavailable” status mean?
“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on May 20, 2023, one of 38 stations in Delaware with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does First State Chevrolet have?
First State Chevrolet has 2 charging ports: 2 DC fast.
Does First State Chevrolet have DC fast charging?
Yes. The registry lists 2 DC fast ports at First State Chevrolet, with CCS connectors.
What connectors does First State Chevrolet have?
First State Chevrolet has CCS connectors.
Is First State Chevrolet open to the public?
Yes. First State Chevrolet is listed with public access, and its status is temporarily unavailable.
Where is First State Chevrolet?
First State Chevrolet is at 22694 Dupont Blvd, Georgetown, DE 19947. Its coordinates are 38.67069, -75.38646.
More EV charging around Georgetown
Working with Delaware charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 261139, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “First State Chevrolet, Georgetown, DE (AFDC station 261139)”, https://chargecensus.com/stations/delaware/first-state-chevrolet-261139 (data as of October 12, 2026).