ChargeCensus

Woodstock Training Post

Available

EV charging station in Woodstock, Connecticut, not on a charging network — 2 Level 2. US DOE AFDC station 220667.

At a glance

Woodstock Training Post is a public EV charging station at 688 CT-169 in Woodstock, Connecticut, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 27, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID220667
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityRestaurant
Open dateMay 27, 2022
Last updated at sourceJun 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
688 CT-169
City
Woodstock
ZIP
06281
Coordinates
41.95608, -71.98158

Within ~15 km

Nearby charging

What kind of charging does Woodstock Training Post offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a restaurant location.

How does Woodstock Training Post compare with other stations in Woodstock?

Woodstock has 4 charging stations in the DOE registry with 10 ports. Woodstock Training Post accounts for 20% of the charging ports in Woodstock. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Woodstock Training Post?

Woodstock Training Post is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 27, 2022, one of 138 stations in Connecticut with a 2022 open date. The station's record was last updated at the source on Jun 12, 2026.

Frequently asked questions

How many chargers does Woodstock Training Post have?

Woodstock Training Post has 2 charging ports: 2 Level 2.

Does Woodstock Training Post have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Woodstock Training Post have?

Woodstock Training Post has J1772 connectors.

Is charging at Woodstock Training Post free?

Pricing as reported to the DOE registry: Free.

Is Woodstock Training Post open to the public?

Yes. Woodstock Training Post is listed with public access, and its status is available.

Where is Woodstock Training Post?

Woodstock Training Post is at 688 CT-169, Woodstock, CT 06281. Its coordinates are 41.95608, -71.98158.

More EV charging around Woodstock

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 220667, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Woodstock Training Post, Woodstock, CT (AFDC station 220667)”, https://chargecensus.com/stations/connecticut/woodstock-training-post-220667 (data as of October 12, 2026).