ChargeCensus

Windham Town Hall

Available

EV charging station in Willimantic, Connecticut on the Red E network — 2 Level 2. US DOE AFDC station 460334.

At a glance

Windham Town Hall is a public EV charging station at 979 Main St in Willimantic, Connecticut, on the Red E network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 29, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID460334
NetworkRed E
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateMay 29, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Red E

Operates 1,105 stations in the DOE registry — view the full network →

Location

Address
979 Main St
City
Willimantic
ZIP
06226
Coordinates
41.71365, -72.21750

Within ~15 km

Nearby charging

What kind of charging does Windham Town Hall offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.

How does Windham Town Hall compare with other stations in Willimantic?

Willimantic has 6 charging stations in the DOE registry with 22 ports. Windham Town Hall accounts for 9% of the charging ports in Willimantic. Red E runs 2 stations in Willimantic. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Windham Town Hall?

Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 23 of those stations are in Connecticut, 1% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 29, 2026, one of 172 stations in Connecticut with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Windham Town Hall have?

Windham Town Hall has 2 charging ports: 2 Level 2.

Does Windham Town Hall have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Windham Town Hall have?

Windham Town Hall has J1772 connectors.

Is Windham Town Hall open to the public?

Yes. Windham Town Hall is listed with public access, and its status is available.

Where is Windham Town Hall?

Windham Town Hall is at 979 Main St, Willimantic, CT 06226. Its coordinates are 41.71365, -72.21750.

More EV charging around Willimantic

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 460334, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Windham Town Hall, Willimantic, CT (AFDC station 460334)”, https://chargecensus.com/stations/connecticut/windham-town-hall-460334 (data as of October 12, 2026).