ChargeCensus

Wilton Riverbrook YMCA

Available

EV charging station in Wilton, Connecticut on the Loop network — 2 Level 2. US DOE AFDC station 348847.

At a glance

Wilton Riverbrook YMCA is a public EV charging station at 404 Danbury Rd in Wilton, Connecticut, on the Loop network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 9, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID348847
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateMay 9, 2023
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
404 Danbury Rd
City
Wilton
ZIP
06897
Coordinates
41.21082, -73.43082

Within ~15 km

Nearby charging

What kind of charging does Wilton Riverbrook YMCA offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.

How does Wilton Riverbrook YMCA compare with other stations in Wilton?

Wilton has 8 charging stations in the DOE registry with 14 ports. Wilton Riverbrook YMCA accounts for 14% of the charging ports in Wilton. Loop runs 2 stations in Wilton. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Wilton Riverbrook YMCA?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 172 of those stations are in Connecticut, 10% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 9, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does Wilton Riverbrook YMCA have?

Wilton Riverbrook YMCA has 2 charging ports: 2 Level 2.

Does Wilton Riverbrook YMCA have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Wilton Riverbrook YMCA have?

Wilton Riverbrook YMCA has J1772 connectors.

Is Wilton Riverbrook YMCA open to the public?

Yes. Wilton Riverbrook YMCA is listed with public access, and its status is available.

Where is Wilton Riverbrook YMCA?

Wilton Riverbrook YMCA is at 404 Danbury Rd, Wilton, CT 06897. Its coordinates are 41.21082, -73.43082.

More EV charging around Wilton

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 348847, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Wilton Riverbrook YMCA, Wilton, CT (AFDC station 348847)”, https://chargecensus.com/stations/connecticut/wilton-riverbrook-ymca-348847 (data as of October 12, 2026).