Vernon Chevy Chevy-Service
AvailableEV charging station in Vernon, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 346064.
At a glance
Vernon Chevy Chevy-Service is a public EV charging station at 175 Hartford Turnpike in Vernon, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 11, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 346064 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 11, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 175 Hartford Turnpike
- City
- Vernon
- State
- Connecticut
- ZIP
- 06066
- Coordinates
- 41.82173, -72.50102
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
AmpUp · Available
- Public Works8 ports
AmpUp · Available
- Evergreen Walk MB.HPC8 ports
Mercedes-Benz HPC · Available
- Whole Foods South Windsor8 ports
EVgo · Available
What kind of charging does Vernon Chevy Chevy-Service offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Vernon Chevy Chevy-Service compare with other stations in Vernon?
Vernon has 10 charging stations in the DOE registry with 31 ports. Vernon Chevy Chevy-Service accounts for 6% of the charging ports in Vernon. ChargePoint runs 3 stations in Vernon. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Vernon Chevy Chevy-Service?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 11, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Vernon Chevy Chevy-Service have?
Vernon Chevy Chevy-Service has 2 charging ports: 2 Level 2.
Does Vernon Chevy Chevy-Service have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Vernon Chevy Chevy-Service have?
Vernon Chevy Chevy-Service has J1772 connectors.
Is Vernon Chevy Chevy-Service open to the public?
Yes. Vernon Chevy Chevy-Service is listed with public access, and its status is available.
Where is Vernon Chevy Chevy-Service?
Vernon Chevy Chevy-Service is at 175 Hartford Turnpike, Vernon, CT 06066. Its coordinates are 41.82173, -72.50102.
More EV charging around Vernon
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 346064, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Vernon Chevy Chevy-Service, Vernon, CT (AFDC station 346064)”, https://chargecensus.com/stations/connecticut/vernon-chevy-chevy-service-346064 (data as of October 12, 2026).