Townsterling Sterling 1
AvailableEV charging station in Sterling, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 355496.
At a glance
Townsterling Sterling 1 is a public EV charging station at 1183 Plainfield Pike in Sterling, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 12, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 355496 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 12, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1183 Plainfield Pike
- City
- Sterling
- State
- Connecticut
- ZIP
- 06377
- Coordinates
- 41.69275, -71.80680
Within ~15 km
Nearby charging
Non-networked · Available
- Voluntown CT Library2 ports
Red E · Available
- Voluntown CT Town Hall2 ports
Red E · Available
AmpUp · Available
- Townsterling Sterling 22 ports
ChargePoint · Available
- 1 Lake St2 ports
Loop · Available
What kind of charging does Townsterling Sterling 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Townsterling Sterling 1 compare with other stations in Sterling?
Sterling has 2 charging stations in the DOE registry with 4 ports. Townsterling Sterling 1 accounts for 50% of the charging ports in Sterling. ChargePoint runs 2 stations in Sterling. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Townsterling Sterling 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 12, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Townsterling Sterling 1 have?
Townsterling Sterling 1 has 2 charging ports: 2 Level 2.
Does Townsterling Sterling 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Townsterling Sterling 1 have?
Townsterling Sterling 1 has J1772 connectors.
Is Townsterling Sterling 1 open to the public?
Yes. Townsterling Sterling 1 is listed with public access, and its status is available.
Where is Townsterling Sterling 1?
Townsterling Sterling 1 is at 1183 Plainfield Pike, Sterling, CT 06377. Its coordinates are 41.69275, -71.80680.
More EV charging around Sterling
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 355496, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Townsterling Sterling 1, Sterling, CT (AFDC station 355496)”, https://chargecensus.com/stations/connecticut/townsterling-sterling-1-355496 (data as of October 12, 2026).