SWTCH Energy Inc.
AvailableEV charging station in Mansfield Center, Connecticut on the SWTCH network — 2 Level 2. US DOE AFDC station 341758.
At a glance
SWTCH Energy Inc. is a public EV charging station at 221 Warrenville Rd in Mansfield Center, Connecticut, on the SWTCH network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 4, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 341758 |
| Network | SWTCH |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Apr 4, 2024 |
| Last updated at source | May 8, 2024 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $2 per hour
Location
- Address
- 221 Warrenville Rd
- City
- Mansfield Center
- State
- Connecticut
- ZIP
- 06250
- Coordinates
- 41.78070, -72.19360
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Non-networked · Available
Non-networked · Available
- Swtch Energy6 ports
SWTCH · Available
- SWTCH Energy Inc.6 ports
SWTCH · Available
- Columbia Town Hall6 ports
Loop · Available
What kind of charging does SWTCH Energy Inc. offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$2 per hour”. The site is listed as a parking lot location.
How does SWTCH Energy Inc. compare with other stations in Mansfield Center?
Mansfield Center has 3 charging stations in the DOE registry with 10 ports. SWTCH Energy Inc. accounts for 20% of the charging ports in Mansfield Center. SWTCH runs 3 stations in Mansfield Center. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates SWTCH Energy Inc.?
SWTCH operates 657 stations in the registry across 32 states, with 318 DC fast and 2,390 Level 2 ports in total. 22 of those stations are in Connecticut, 1% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 4, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on May 8, 2024.
Frequently asked questions
How many chargers does SWTCH Energy Inc. have?
SWTCH Energy Inc. has 2 charging ports: 2 Level 2.
Does SWTCH Energy Inc. have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does SWTCH Energy Inc. have?
SWTCH Energy Inc. has J1772 connectors.
Is charging at SWTCH Energy Inc. free?
Pricing as reported to the DOE registry: $2 per hour.
Is SWTCH Energy Inc. open to the public?
Yes. SWTCH Energy Inc. is listed with public access, and its status is available.
Where is SWTCH Energy Inc.?
SWTCH Energy Inc. is at 221 Warrenville Rd, Mansfield Center, CT 06250. Its coordinates are 41.78070, -72.19360.
More EV charging around Mansfield Center
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 341758, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “SWTCH Energy Inc., Mansfield Center, CT (AFDC station 341758)”, https://chargecensus.com/stations/connecticut/swtch-energy-inc-341758 (data as of October 12, 2026).