Spirep Iron Works
AvailableEV charging station in Norwalk, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 79730.
At a glance
Spirep Iron Works is a public EV charging station at 1 N Water St in Norwalk, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 15, 2016.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 79730 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 15, 2016 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1 N Water St
- City
- Norwalk
- State
- Connecticut
- ZIP
- 06854
- Coordinates
- 41.09997, -73.41659
Within ~15 km
Nearby charging
- 18 Dock St46 ports
Loop · Available
- Stamford Parking Garage38 ports
AmpUp · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Vdrs12 ports
FLO · Available
What kind of charging does Spirep Iron Works offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Spirep Iron Works compare with other stations in Norwalk?
Norwalk has 31 charging stations in the DOE registry with 121 ports, the 16th-most of 165 cities and towns in Connecticut. Spirep Iron Works accounts for 2% of the charging ports in Norwalk. ChargePoint runs 11 stations in Norwalk. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Spirep Iron Works?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 15, 2016, one of 54 stations in Connecticut with a 2016 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Spirep Iron Works have?
Spirep Iron Works has 2 charging ports: 2 Level 2.
Does Spirep Iron Works have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Spirep Iron Works have?
Spirep Iron Works has J1772 connectors.
Is Spirep Iron Works open to the public?
Yes. Spirep Iron Works is listed with public access, and its status is available.
Where is Spirep Iron Works?
Spirep Iron Works is at 1 N Water St, Norwalk, CT 06854. Its coordinates are 41.09997, -73.41659.
More EV charging around Norwalk
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 79730, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Spirep Iron Works, Norwalk, CT (AFDC station 79730)”, https://chargecensus.com/stations/connecticut/spirep-iron-works-79730 (data as of October 12, 2026).