ChargeCensus

Sherman Green

Available

EV charging station in Fairfield, Connecticut on the AmpUp network — 2 Level 2. US DOE AFDC station 319392.

At a glance

Sherman Green is a public EV charging station at 93 Reef Rd in Fairfield, Connecticut, on the AmpUp network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 17, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID319392
NetworkAmpUp
StatusAvailable (E)
AccessPublic
FacilityParking lot
Open dateJul 17, 2023
Last updated at sourceOct 8, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.35 per kWh

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
93 Reef Rd
ZIP
06824
Coordinates
41.14058, -73.25716

Within ~15 km

Nearby charging

What kind of charging does Sherman Green offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.35 per kWh”. The site is listed as a parking lot location.

How does Sherman Green compare with other stations in Fairfield?

Fairfield has 33 charging stations in the DOE registry with 114 ports, the 14th-most of 165 cities and towns in Connecticut. Sherman Green accounts for 2% of the charging ports in Fairfield. AmpUp runs 4 stations in Fairfield. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Sherman Green?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 178 of those stations are in Connecticut, 10% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 17, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 8, 2026.

Frequently asked questions

How many chargers does Sherman Green have?

Sherman Green has 2 charging ports: 2 Level 2.

Does Sherman Green have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Sherman Green have?

Sherman Green has J1772 connectors.

Is charging at Sherman Green free?

Pricing as reported to the DOE registry: $0.35 per kWh.

Is Sherman Green open to the public?

Yes. Sherman Green is listed with public access, and its status is available.

Where is Sherman Green?

Sherman Green is at 93 Reef Rd, Fairfield, CT 06824. Its coordinates are 41.14058, -73.25716.

More EV charging around Fairfield

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 319392, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Sherman Green, Fairfield, CT (AFDC station 319392)”, https://chargecensus.com/stations/connecticut/sherman-green-319392 (data as of October 12, 2026).