ChargeCensus

Shaw's Cove

Available

EV charging station in New London, Connecticut on the FLO network — 2 Level 2. US DOE AFDC station 250597.

At a glance

Shaw's Cove is a public EV charging station at 5 Shaw's Cove in New London, Connecticut, on the FLO network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 12, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID250597
NetworkFLO
StatusAvailable (E)
AccessPublic
Open dateJan 12, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

FLO

Operates 1,246 stations in the DOE registry — view the full network →

Location

Address
5 Shaw's Cove
ZIP
06320
Coordinates
41.34804, -72.10154

Within ~15 km

Nearby charging

What kind of charging does Shaw's Cove offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Shaw's Cove compare with other stations in New London?

New London has 41 charging stations in the DOE registry with 106 ports, the 8th-most of 165 cities and towns in Connecticut. Shaw's Cove accounts for 2% of the charging ports in New London. FLO runs 5 stations in New London. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Shaw's Cove?

FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 89 of those stations are in Connecticut, 5% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 12, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Shaw's Cove have?

Shaw's Cove has 2 charging ports: 2 Level 2.

Does Shaw's Cove have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Shaw's Cove have?

Shaw's Cove has J1772 connectors.

Is Shaw's Cove open to the public?

Yes. Shaw's Cove is listed with public access, and its status is available.

Where is Shaw's Cove?

Shaw's Cove is at 5 Shaw's Cove, New London, CT 06320. Its coordinates are 41.34804, -72.10154.

More EV charging around New London

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 250597, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Shaw's Cove, New London, CT (AFDC station 250597)”, https://chargecensus.com/stations/connecticut/shaw-s-cove-250597 (data as of October 12, 2026).