Shagbark Lumber Station 1
Temporarily unavailableEV charging station in East Haddam, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 334271.
Total ports
2
DC fast
0
Level 2
2
Access
Public
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 334271 |
| Network | ChargePoint |
| Status | Temporarily unavailable (T) |
| Access | Public |
| Open date | Apr 30, 2024 |
| Last updated at source | Jul 22, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry — check the network app for current rates.
Location
- Address
- 374 Town St
- City
- East Haddam
- State
- Connecticut
- ZIP
- 06423
- Coordinates
- 41.46354, -72.44166
Within ~15 km
Nearby charging
- Goodspeed Opera House10 ports
FLO · Available
FLO · Available
- 12 Main St2 ports
AmpUp · Available
- 150 Main St2 ports
Loop · Available
- Masonicare2 ports
Loop · Available
- United States Postal Service2 ports
AmpUp · Available
Frequently asked questions
How many chargers does Shagbark Lumber Station 1 have?
The station has 2 charging ports: 2 Level 2.
What connectors does Shagbark Lumber Station 1 have?
Available connectors: J1772.
Is charging at Shagbark Lumber Station 1 free?
No pricing is listed in the DOE registry for this station — check the ChargePoint app for current rates.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 334271, weekly full pull.