Putnam Chrysler
PlannedEV charging station in Putnam, Connecticut on the ViaLynk network — 1 DC fast · 3 Level 2. US DOE AFDC station 352042.
At a glance
Putnam Chrysler is a public EV charging station at 157 Providence Pike in Putnam, Connecticut, on the ViaLynk network. It has 4 charging ports (1 DC fast · 3 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as planned, with a listed open date of Aug 2, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 352042 |
| Network | ViaLynk |
| Status | Planned (P) |
| Access | Public |
| Open date | Aug 2, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 157 Providence Pike
- City
- Putnam
- State
- Connecticut
- ZIP
- 06260
- Coordinates
- 41.92653, -71.86727
Within ~15 km
Nearby charging
- Dimension - Polyant Chargers4 ports
AmpUp · Available
FLO · Available
- Cargill Chevrolet3 ports
Non-networked · Available
Non-networked · Available
- Pomfret Public Library2 ports
FLO · Available
- Pomfret Community Center2 ports
FLO · Available
What kind of charging does Putnam Chrysler offer?
Of its 4 ports, 1 is DC fast and 3 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% above the Connecticut average of 3.1 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.
How does Putnam Chrysler compare with other stations in Putnam?
Putnam has 12 charging stations in the DOE registry with 25 ports. Putnam Chrysler accounts for 16% of the charging ports in Putnam. It is the only ViaLynk station in Putnam. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Putnam Chrysler?
ViaLynk operates 1,012 stations in the registry across 35 states, with 616 DC fast and 4,903 Level 2 ports in total. 9 of those stations are in Connecticut, under 1% of the state's 1,807.
What does the “Planned” status mean?
“Planned” means the station has been reported to the registry as planned and is not yet open. Its access code is public, meaning it is listed as open to any driver. Its listed open date is Aug 2, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Putnam Chrysler have?
Putnam Chrysler has 4 charging ports: 1 DC fast · 3 Level 2.
Does Putnam Chrysler have DC fast charging?
Yes. The registry lists 1 DC fast port at Putnam Chrysler, with CCS connectors.
What connectors does Putnam Chrysler have?
Putnam Chrysler has J1772 and CCS connectors.
Is Putnam Chrysler open to the public?
Yes. Putnam Chrysler is listed with public access, and its status is planned.
Where is Putnam Chrysler?
Putnam Chrysler is at 157 Providence Pike, Putnam, CT 06260. Its coordinates are 41.92653, -71.86727.
More EV charging around Putnam
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 352042, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Putnam Chrysler, Putnam, CT (AFDC station 352042)”, https://chargecensus.com/stations/connecticut/putnam-chrysler-352042 (data as of October 12, 2026).