ChargeCensus

Ptr Ptr Station 2

Available

EV charging station in Enfield, Connecticut on the ChargePoint network — 1 DC fast. US DOE AFDC station 396248.

At a glance

Ptr Ptr Station 2 is a public EV charging station at 120 Post Rd in Enfield, Connecticut, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since May 24, 2025.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID396248
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 24, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
120 Post Rd
ZIP
06082
Coordinates
41.97242, -72.58450

Within ~15 km

Nearby charging

What kind of charging does Ptr Ptr Station 2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 67% below the Connecticut average of 3.1 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Ptr Ptr Station 2 compare with other stations in Enfield?

Enfield has 12 charging stations in the DOE registry with 50 ports. Ptr Ptr Station 2 accounts for 2% of the charging ports in Enfield. ChargePoint runs 3 stations in Enfield. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Ptr Ptr Station 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 24, 2025, one of 292 stations in Connecticut with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ptr Ptr Station 2 have?

Ptr Ptr Station 2 has 1 charging port: 1 DC fast.

Does Ptr Ptr Station 2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Ptr Ptr Station 2, with CHAdeMO and CCS connectors.

What connectors does Ptr Ptr Station 2 have?

Ptr Ptr Station 2 has CHAdeMO and CCS connectors.

Is Ptr Ptr Station 2 open to the public?

Yes. Ptr Ptr Station 2 is listed with public access, and its status is available.

Where is Ptr Ptr Station 2?

Ptr Ptr Station 2 is at 120 Post Rd, Enfield, CT 06082. Its coordinates are 41.97242, -72.58450.

More EV charging around Enfield

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 396248, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ptr Ptr Station 2, Enfield, CT (AFDC station 396248)”, https://chargecensus.com/stations/connecticut/ptr-ptr-station-2-396248 (data as of October 12, 2026).