ChargeCensus

PDQ Plumbing & Heating

Available

EV charging station in Bridgeport, Connecticut on the Loop network — 2 Level 2. US DOE AFDC station 399322.

At a glance

PDQ Plumbing & Heating is a public EV charging station at 681 Housatonic Ave in Bridgeport, Connecticut, on the Loop network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 22, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID399322
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateSep 22, 2023
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
681 Housatonic Ave
ZIP
06610
Coordinates
41.19388, -73.19336

Within ~15 km

Nearby charging

What kind of charging does PDQ Plumbing & Heating offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.

How does PDQ Plumbing & Heating compare with other stations in Bridgeport?

Bridgeport has 24 charging stations in the DOE registry with 96 ports, the 20th-most of 165 cities and towns in Connecticut. PDQ Plumbing & Heating accounts for 2% of the charging ports in Bridgeport. Loop runs 5 stations in Bridgeport. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates PDQ Plumbing & Heating?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 172 of those stations are in Connecticut, 10% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 22, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does PDQ Plumbing & Heating have?

PDQ Plumbing & Heating has 2 charging ports: 2 Level 2.

Does PDQ Plumbing & Heating have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does PDQ Plumbing & Heating have?

PDQ Plumbing & Heating has J1772 connectors.

Is PDQ Plumbing & Heating open to the public?

Yes. PDQ Plumbing & Heating is listed with public access, and its status is available.

Where is PDQ Plumbing & Heating?

PDQ Plumbing & Heating is at 681 Housatonic Ave, Bridgeport, CT 06610. Its coordinates are 41.19388, -73.19336.

More EV charging around Bridgeport

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 399322, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “PDQ Plumbing & Heating, Bridgeport, CT (AFDC station 399322)”, https://chargecensus.com/stations/connecticut/pdq-plumbing-heating-399322 (data as of October 12, 2026).