ChargeCensus

Parking Lot

Available

EV charging station in Stamford, Connecticut on the Evoke network — 5 Level 2. US DOE AFDC station 357092.

At a glance

Parking Lot is a public EV charging station at 711 Canal Street in Stamford, Connecticut, on the Evoke network. It has 5 charging ports (5 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 27, 2025.

Total ports
5
DC fast
0
Level 2
5
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID357092
NetworkEvoke
StatusAvailable (E)
AccessPublic
FacilityMulti-unit dwelling
Open dateAug 27, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Evoke

Operates 395 stations in the DOE registry — view the full network →

Location

Address
711 Canal Street
ZIP
06902
Coordinates
41.04451, -73.53374

Within ~15 km

Nearby charging

What kind of charging does Parking Lot offer?

Of its 5 ports, 5 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 63% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a multi-unit dwelling location.

How does Parking Lot compare with other stations in Stamford?

Stamford has 53 charging stations in the DOE registry with 309 ports, the 5th-most of 165 cities and towns in Connecticut. Parking Lot accounts for 2% of the charging ports in Stamford. Evoke runs 2 stations in Stamford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Parking Lot?

Evoke operates 395 stations in the registry across 20 states, with 49 DC fast and 2,746 Level 2 ports in total. 6 of those stations are in Connecticut, under 1% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 27, 2025, one of 292 stations in Connecticut with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Parking Lot have?

Parking Lot has 5 charging ports: 5 Level 2.

Does Parking Lot have DC fast charging?

No. The registry lists no DC fast ports here; its 5 ports are all Level 2.

What connectors does Parking Lot have?

Parking Lot has J1772 connectors.

Is Parking Lot open to the public?

Yes. Parking Lot is listed with public access, and its status is available.

Where is Parking Lot?

Parking Lot is at 711 Canal Street, Stamford, CT 06902. Its coordinates are 41.04451, -73.53374.

More EV charging around Stamford

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 357092, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Parking Lot, Stamford, CT (AFDC station 357092)”, https://chargecensus.com/stations/connecticut/parking-lot-357092 (data as of October 12, 2026).