No 1 is a public EV charging station at 16 Pearl St in New London, Connecticut, not attached to a charging network. It has 3 charging ports (1 DC fast · 2 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since May 13, 2024.

Total ports
3
DC fast
1
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID349567
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityPay parking garage
Open dateMay 13, 2024
Last updated at sourceMay 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
16 Pearl St
ZIP
06346
Coordinates
41.35233, -72.09628

Within ~15 km

Nearby charging

What kind of charging does No 1 offer?

Of its 3 ports, 1 is DC fast and 2 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is roughly in line with the Connecticut average of 3.1 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a pay parking garage location.

How does No 1 compare with other stations in New London?

New London has 41 charging stations in the DOE registry with 106 ports, the 8th-most of 165 cities and towns in Connecticut. No 1 accounts for 3% of the charging ports in New London. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates No 1?

No 1 is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 13, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on May 22, 2026.

Frequently asked questions

How many chargers does No 1 have?

No 1 has 3 charging ports: 1 DC fast · 2 Level 2.

Does No 1 have DC fast charging?

Yes. The registry lists 1 DC fast port at No 1, with CCS connectors.

What connectors does No 1 have?

No 1 has J1772 and CCS connectors.

Is No 1 open to the public?

Yes. No 1 is listed with public access, and its status is available.

Where is No 1?

No 1 is at 16 Pearl St, New London, CT 06346. Its coordinates are 41.35233, -72.09628.

More EV charging around New London

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 349567, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “No 1, New London, CT (AFDC station 349567)”, https://chargecensus.com/stations/connecticut/no-1-349567 (data as of October 12, 2026).