ChargeCensus

Modern Milkman Oak2

Available

EV charging station in Ellington, Connecticut on the ChargePoint network — 1 Level 2. US DOE AFDC station 374156.

At a glance

Modern Milkman Oak2 is a public EV charging station at 80 Meadow Brook Rd in Ellington, Connecticut, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 19, 2024.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID374156
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 19, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
80 Meadow Brook Rd
ZIP
06029
Coordinates
41.91853, -72.46925

Within ~15 km

Nearby charging

What kind of charging does Modern Milkman Oak2 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 67% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Modern Milkman Oak2 compare with other stations in Ellington?

Ellington has 10 charging stations in the DOE registry with 24 ports. Modern Milkman Oak2 accounts for 4% of the charging ports in Ellington. ChargePoint runs 6 stations in Ellington. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Modern Milkman Oak2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 19, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Modern Milkman Oak2 have?

Modern Milkman Oak2 has 1 charging port: 1 Level 2.

Does Modern Milkman Oak2 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Modern Milkman Oak2 have?

Modern Milkman Oak2 has J1772 connectors.

Is Modern Milkman Oak2 open to the public?

Yes. Modern Milkman Oak2 is listed with public access, and its status is available.

Where is Modern Milkman Oak2?

Modern Milkman Oak2 is at 80 Meadow Brook Rd, Ellington, CT 06029. Its coordinates are 41.91853, -72.46925.

More EV charging around Ellington

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 374156, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Modern Milkman Oak2, Ellington, CT (AFDC station 374156)”, https://chargecensus.com/stations/connecticut/modern-milkman-oak2-374156 (data as of October 12, 2026).