Metro135 Metro 135 - 1
AvailableEV charging station in Milford, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 312425.
At a glance
Metro135 Metro 135 - 1 is a public EV charging station at 131 Broad St in Milford, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 6, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 312425 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 6, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 131 Broad St
- City
- Milford
- State
- Connecticut
- ZIP
- 06460
- Coordinates
- 41.22127, -73.06102
Within ~15 km
Nearby charging
- Orchard Street Garage35 ports
Blink · Available
- 855 Main St16 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Hotel Marcel12 ports
EV Connect · Available
What kind of charging does Metro135 Metro 135 - 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Metro135 Metro 135 - 1 compare with other stations in Milford?
Milford has 32 charging stations in the DOE registry with 81 ports, the 15th-most of 165 cities and towns in Connecticut. Metro135 Metro 135 - 1 accounts for 2% of the charging ports in Milford. ChargePoint runs 17 stations in Milford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Metro135 Metro 135 - 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 6, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Metro135 Metro 135 - 1 have?
Metro135 Metro 135 - 1 has 2 charging ports: 2 Level 2.
Does Metro135 Metro 135 - 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Metro135 Metro 135 - 1 have?
Metro135 Metro 135 - 1 has J1772 connectors.
Is Metro135 Metro 135 - 1 open to the public?
Yes. Metro135 Metro 135 - 1 is listed with public access, and its status is available.
Where is Metro135 Metro 135 - 1?
Metro135 Metro 135 - 1 is at 131 Broad St, Milford, CT 06460. Its coordinates are 41.22127, -73.06102.
More EV charging around Milford
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 312425, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Metro135 Metro 135 - 1, Milford, CT (AFDC station 312425)”, https://chargecensus.com/stations/connecticut/metro135-metro-135-1-312425 (data as of October 12, 2026).