Metro Ground G Station 2
AvailableEV charging station in Hartford, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 224617.
At a glance
Metro Ground G Station 2 is a public EV charging station at 150 High Street in Hartford, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 29, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 224617 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 29, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 150 High Street
- City
- Hartford
- State
- Connecticut
- ZIP
- 06103
- Coordinates
- 41.77023, -72.67927
Within ~15 km
Nearby charging
- Collins Parking Garage40 ports
AmpUp · Available
- SWTCH Energy32 ports
SWTCH · Available
- DOT Public EV Stations30 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Destination · Available
- 1222 Stanley Street12 ports
Non-networked · Available
What kind of charging does Metro Ground G Station 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Metro Ground G Station 2 compare with other stations in Hartford?
Hartford has 147 charging stations in the DOE registry with 483 ports, the 2nd-most of 165 cities and towns in Connecticut. Metro Ground G Station 2 accounts for under 1% of the charging ports in Hartford. ChargePoint runs 65 stations in Hartford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Metro Ground G Station 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 29, 2022, one of 138 stations in Connecticut with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Metro Ground G Station 2 have?
Metro Ground G Station 2 has 2 charging ports: 2 Level 2.
Does Metro Ground G Station 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Metro Ground G Station 2 have?
Metro Ground G Station 2 has J1772 connectors.
Is Metro Ground G Station 2 open to the public?
Yes. Metro Ground G Station 2 is listed with public access, and its status is available.
Where is Metro Ground G Station 2?
Metro Ground G Station 2 is at 150 High Street, Hartford, CT 06103. Its coordinates are 41.77023, -72.67927.
More EV charging around Hartford
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 224617, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Metro Ground G Station 2, Hartford, CT (AFDC station 224617)”, https://chargecensus.com/stations/connecticut/metro-ground-g-station-2-224617 (data as of October 12, 2026).