Mercedes-Benz of New London
AvailableEV charging station in New London, Connecticut on the evGateway network — 4 DC fast. US DOE AFDC station 378094.
At a glance
Mercedes-Benz of New London is a public EV charging station at 488 Colman St in New London, Connecticut, on the evGateway network. It has 4 charging ports (4 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Feb 6, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 378094 |
| Network | evGateway |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 6, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 488 Colman St
- City
- New London
- State
- Connecticut
- ZIP
- 06320
- Coordinates
- 41.36236, -72.11738
Within ~15 km
Nearby charging
- 1 Maple Tree22 ports
Evium · Available
Tesla Destination · Available
Tesla Destination · Available
Tesla Destination · Available
Non-networked · Available
- SUBASE New London / N00129-B86-110 ports
Non-networked · Available
What kind of charging does Mercedes-Benz of New London offer?
Of its 4 ports, 4 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 31% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Mercedes-Benz of New London compare with other stations in New London?
New London has 41 charging stations in the DOE registry with 106 ports, the 8th-most of 165 cities and towns in Connecticut. Mercedes-Benz of New London accounts for 4% of the charging ports in New London. It is the only evGateway station in New London. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Mercedes-Benz of New London?
evGateway operates 481 stations in the registry across 42 states, with 560 DC fast and 2,523 Level 2 ports in total. 34 of those stations are in Connecticut, 2% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 6, 2025, one of 292 stations in Connecticut with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mercedes-Benz of New London have?
Mercedes-Benz of New London has 4 charging ports: 4 DC fast.
Does Mercedes-Benz of New London have DC fast charging?
Yes. The registry lists 4 DC fast ports at Mercedes-Benz of New London, with CCS connectors.
What connectors does Mercedes-Benz of New London have?
Mercedes-Benz of New London has CCS connectors.
Is Mercedes-Benz of New London open to the public?
Yes. Mercedes-Benz of New London is listed with public access, and its status is available.
Where is Mercedes-Benz of New London?
Mercedes-Benz of New London is at 488 Colman St, New London, CT 06320. Its coordinates are 41.36236, -72.11738.
More EV charging around New London
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 378094, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mercedes-Benz of New London, New London, CT (AFDC station 378094)”, https://chargecensus.com/stations/connecticut/mercedes-benz-of-new-london-378094 (data as of October 12, 2026).