Ion Bank Southington
AvailableEV charging station in Southington, Connecticut on the AmpUp network — 2 Level 2. US DOE AFDC station 319326.
At a glance
Ion Bank Southington is a public EV charging station at 365 N Main St in Southington, Connecticut, on the AmpUp network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 27, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 319326 |
| Network | AmpUp |
| Status | Available (E) |
| Access | Public |
| Facility | Bank |
| Open date | Sep 27, 2023 |
| Last updated at source | Oct 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 365 N Main St
- City
- Southington
- State
- Connecticut
- ZIP
- 06489
- Coordinates
- 41.61000, -72.88000
Within ~15 km
Nearby charging
- SWTCH Energy32 ports
SWTCH · Available
- 1251 Farmington Ave24 ports
Loop · Available
- Bristol Events Center16 ports
Flash · Available
- 1222 Stanley Street12 ports
Non-networked · Available
- 300 Schraffts Dr.12 ports
Non-networked · Available
Tesla Supercharger · Available
What kind of charging does Ion Bank Southington offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a bank location.
How does Ion Bank Southington compare with other stations in Southington?
Southington has 11 charging stations in the DOE registry with 38 ports. Ion Bank Southington accounts for 5% of the charging ports in Southington. AmpUp runs 2 stations in Southington. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Ion Bank Southington?
AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 178 of those stations are in Connecticut, 10% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 27, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 2, 2026.
Frequently asked questions
How many chargers does Ion Bank Southington have?
Ion Bank Southington has 2 charging ports: 2 Level 2.
Does Ion Bank Southington have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ion Bank Southington have?
Ion Bank Southington has J1772 connectors.
Is Ion Bank Southington open to the public?
Yes. Ion Bank Southington is listed with public access, and its status is available.
Where is Ion Bank Southington?
Ion Bank Southington is at 365 N Main St, Southington, CT 06489. Its coordinates are 41.61000, -72.88000.
More EV charging around Southington
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 319326, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ion Bank Southington, Southington, CT (AFDC station 319326)”, https://chargecensus.com/stations/connecticut/ion-bank-southington-319326 (data as of October 12, 2026).