Hlexus Ct4k 1
AvailableEV charging station in East Hartford, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 312164.
At a glance
Hlexus Ct4k 1 is a public EV charging station at 750 Connecticut Blvd in East Hartford, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 3, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 312164 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 3, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 750 Connecticut Blvd
- City
- East Hartford
- State
- Connecticut
- ZIP
- 06108
- Coordinates
- 41.77036, -72.65963
Within ~15 km
Nearby charging
- Collins Parking Garage40 ports
AmpUp · Available
- SWTCH Energy32 ports
SWTCH · Available
- DOT Public EV Stations30 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Destination · Available
- 1222 Stanley Street12 ports
Non-networked · Available
What kind of charging does Hlexus Ct4k 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Hlexus Ct4k 1 compare with other stations in East Hartford?
East Hartford has 62 charging stations in the DOE registry with 138 ports, the 4th-most of 165 cities and towns in Connecticut. Hlexus Ct4k 1 accounts for 1% of the charging ports in East Hartford. ChargePoint runs 50 stations in East Hartford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Hlexus Ct4k 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 3, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Hlexus Ct4k 1 have?
Hlexus Ct4k 1 has 2 charging ports: 2 Level 2.
Does Hlexus Ct4k 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Hlexus Ct4k 1 have?
Hlexus Ct4k 1 has J1772 connectors.
Is Hlexus Ct4k 1 open to the public?
Yes. Hlexus Ct4k 1 is listed with public access, and its status is available.
Where is Hlexus Ct4k 1?
Hlexus Ct4k 1 is at 750 Connecticut Blvd, East Hartford, CT 06108. Its coordinates are 41.77036, -72.65963.
More EV charging around East Hartford
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 312164, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Hlexus Ct4k 1, East Hartford, CT (AFDC station 312164)”, https://chargecensus.com/stations/connecticut/hlexus-ct4k-1-312164 (data as of October 12, 2026).