ChargeCensus

Grk Station 1

Available

EV charging station in Enfield, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 233181.

At a glance

Grk Station 1 is a public EV charging station at 809 Enfield St in Enfield, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 9, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID233181
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 9, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
809 Enfield St
ZIP
06082
Coordinates
42.00033, -72.59357

Within ~15 km

Nearby charging

What kind of charging does Grk Station 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Grk Station 1 compare with other stations in Enfield?

Enfield has 12 charging stations in the DOE registry with 50 ports. Grk Station 1 accounts for 4% of the charging ports in Enfield. ChargePoint runs 3 stations in Enfield. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Grk Station 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 9, 2022, one of 138 stations in Connecticut with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Grk Station 1 have?

Grk Station 1 has 2 charging ports: 2 Level 2.

Does Grk Station 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Grk Station 1 have?

Grk Station 1 has J1772 connectors.

Is Grk Station 1 open to the public?

Yes. Grk Station 1 is listed with public access, and its status is available.

Where is Grk Station 1?

Grk Station 1 is at 809 Enfield St, Enfield, CT 06082. Its coordinates are 42.00033, -72.59357.

More EV charging around Enfield

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 233181, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Grk Station 1, Enfield, CT (AFDC station 233181)”, https://chargecensus.com/stations/connecticut/grk-station-1-233181 (data as of October 12, 2026).