At a glance
Griffin Electrical Contractors is a public EV charging station at 110 Newell St in Southington, Connecticut, on the Loop network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 19, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 348793 |
| Network | Loop |
| Status | Available (E) |
| Access | Public |
| Facility | Other |
| Open date | Sep 19, 2022 |
| Last updated at source | Sep 22, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 110 Newell St
- City
- Southington
- State
- Connecticut
- ZIP
- 06489
- Coordinates
- 41.64211, -72.87752
Within ~15 km
Nearby charging
- SWTCH Energy32 ports
SWTCH · Available
- 1251 Farmington Ave24 ports
Loop · Available
- Bristol Events Center16 ports
Flash · Available
Tesla Supercharger · Available
- 300 Schraffts Dr.12 ports
Non-networked · Available
- 1222 Stanley Street12 ports
Non-networked · Available
What kind of charging does Griffin Electrical Contractors offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.
How does Griffin Electrical Contractors compare with other stations in Southington?
Southington has 11 charging stations in the DOE registry with 38 ports. Griffin Electrical Contractors accounts for 11% of the charging ports in Southington. It is the only Loop station in Southington. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Griffin Electrical Contractors?
Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 172 of those stations are in Connecticut, 10% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 19, 2022, one of 138 stations in Connecticut with a 2022 open date. The station's record was last updated at the source on Sep 22, 2026.
Frequently asked questions
How many chargers does Griffin Electrical Contractors have?
Griffin Electrical Contractors has 4 charging ports: 4 Level 2.
Does Griffin Electrical Contractors have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does Griffin Electrical Contractors have?
Griffin Electrical Contractors has J1772 connectors.
Is Griffin Electrical Contractors open to the public?
Yes. Griffin Electrical Contractors is listed with public access, and its status is available.
Where is Griffin Electrical Contractors?
Griffin Electrical Contractors is at 110 Newell St, Southington, CT 06489. Its coordinates are 41.64211, -72.87752.
More EV charging around Southington
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 348793, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Griffin Electrical Contractors, Southington, CT (AFDC station 348793)”, https://chargecensus.com/stations/connecticut/griffin-electrical-contractors-348793 (data as of October 12, 2026).