ChargeCensus

Greens Farms Railroad Station Lot #2

Available

EV charging station in Westport, Connecticut on the Blink network — 1 Level 2. US DOE AFDC station 255176.

At a glance

Greens Farms Railroad Station Lot #2 is a public EV charging station at 2 Post Office Ln in Westport, Connecticut, on the Blink network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 20, 2020.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID255176
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateMay 20, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
2 Post Office Ln
ZIP
6880
Coordinates
41.12246, -73.31506

Within ~15 km

Nearby charging

What kind of charging does Greens Farms Railroad Station Lot #2 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 67% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Greens Farms Railroad Station Lot #2 compare with other stations in Westport?

Westport has 14 charging stations in the DOE registry with 49 ports. Greens Farms Railroad Station Lot #2 accounts for 2% of the charging ports in Westport. Blink runs 5 stations in Westport. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Greens Farms Railroad Station Lot #2?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 62 of those stations are in Connecticut, 3% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 20, 2020, one of 37 stations in Connecticut with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Greens Farms Railroad Station Lot #2 have?

Greens Farms Railroad Station Lot #2 has 1 charging port: 1 Level 2.

Does Greens Farms Railroad Station Lot #2 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Greens Farms Railroad Station Lot #2 have?

Greens Farms Railroad Station Lot #2 has J1772 connectors.

Is Greens Farms Railroad Station Lot #2 open to the public?

Yes. Greens Farms Railroad Station Lot #2 is listed with public access, and its status is available.

Where is Greens Farms Railroad Station Lot #2?

Greens Farms Railroad Station Lot #2 is at 2 Post Office Ln, Westport, CT 6880. Its coordinates are 41.12246, -73.31506.

More EV charging around Westport

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 255176, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Greens Farms Railroad Station Lot #2, Westport, CT (AFDC station 255176)”, https://chargecensus.com/stations/connecticut/greens-farms-railroad-station-lot-2-255176 (data as of October 12, 2026).