ChargeCensus

Green Bank

Available

EV charging station in Hartford, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 123274.

At a glance

Green Bank is a public EV charging station at 75 Charter Oak Ave in Hartford, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 1, 2016.

Total ports
2
DC fast
0
Level 2
2
Access
Public
workplace charging
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID123274
NetworkChargePoint
StatusAvailable (E)
AccessPublic
FacilityOffice building
Open dateAug 1, 2016
Last updated at sourceSep 14, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
75 Charter Oak Ave
ZIP
06106
Coordinates
41.64177, -72.67612

Within ~15 km

Nearby charging

What kind of charging does Green Bank offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a office building location. It is flagged as workplace charging.

How does Green Bank compare with other stations in Hartford?

Hartford has 147 charging stations in the DOE registry with 483 ports, the 2nd-most of 165 cities and towns in Connecticut. Green Bank accounts for under 1% of the charging ports in Hartford. ChargePoint runs 65 stations in Hartford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Green Bank?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 1, 2016, one of 54 stations in Connecticut with a 2016 open date. The station's record was last updated at the source on Sep 14, 2026.

Frequently asked questions

How many chargers does Green Bank have?

Green Bank has 2 charging ports: 2 Level 2.

Does Green Bank have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Green Bank have?

Green Bank has J1772 connectors.

Is Green Bank open to the public?

Yes. Green Bank is listed with public access, and its status is available.

Where is Green Bank?

Green Bank is at 75 Charter Oak Ave, Hartford, CT 06106. Its coordinates are 41.64177, -72.67612.

More EV charging around Hartford

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 123274, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Green Bank, Hartford, CT (AFDC station 123274)”, https://chargecensus.com/stations/connecticut/green-bank-123274 (data as of October 12, 2026).