Generation Drywall
AvailableEV charging station in Hartford, Connecticut on the AmpUp network — 4 Level 2. US DOE AFDC station 262092.
At a glance
Generation Drywall is a public EV charging station at 75 Elliott St E in Hartford, Connecticut, on the AmpUp network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 23, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 262092 |
| Network | AmpUp |
| Status | Available (E) |
| Access | Public |
| Facility | Office building |
| Open date | Feb 23, 2023 |
| Last updated at source | Oct 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.30 per kWh
Location
- Address
- 75 Elliott St E
- City
- Hartford
- State
- Connecticut
- ZIP
- 06114
- Coordinates
- 41.74659, -72.66994
Within ~15 km
Nearby charging
- Collins Parking Garage40 ports
AmpUp · Available
- SWTCH Energy32 ports
SWTCH · Available
- DOT Public EV Stations30 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Destination · Available
Tesla Supercharger · Available
What kind of charging does Generation Drywall offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.30 per kWh”. The site is listed as a office building location. It is flagged as workplace charging.
How does Generation Drywall compare with other stations in Hartford?
Hartford has 147 charging stations in the DOE registry with 483 ports, the 2nd-most of 165 cities and towns in Connecticut. Generation Drywall accounts for under 1% of the charging ports in Hartford. AmpUp runs 24 stations in Hartford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Generation Drywall?
AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 178 of those stations are in Connecticut, 10% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 23, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 2, 2026.
Frequently asked questions
How many chargers does Generation Drywall have?
Generation Drywall has 4 charging ports: 4 Level 2.
Does Generation Drywall have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does Generation Drywall have?
Generation Drywall has J1772 connectors.
Is charging at Generation Drywall free?
Pricing as reported to the DOE registry: $0.30 per kWh.
Is Generation Drywall open to the public?
Yes. Generation Drywall is listed with public access, and its status is available.
Where is Generation Drywall?
Generation Drywall is at 75 Elliott St E, Hartford, CT 06114. Its coordinates are 41.74659, -72.66994.
More EV charging around Hartford
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 262092, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Generation Drywall, Hartford, CT (AFDC station 262092)”, https://chargecensus.com/stations/connecticut/generation-drywall-262092 (data as of October 12, 2026).