Gates GMC Nissan
AvailableEV charging station in North Windham, Connecticut on the AmpUp network — 2 Level 2. US DOE AFDC station 415744.
At a glance
Gates GMC Nissan is a public EV charging station at 143 Boston Post Rd in North Windham, Connecticut, on the AmpUp network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 24, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 415744 |
| Network | AmpUp |
| Status | Available (E) |
| Access | Public |
| Facility | Car dealership |
| Open date | May 24, 2024 |
| Last updated at source | Oct 8, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.50 per kWh
Location
- Address
- 143 Boston Post Rd
- City
- North Windham
- State
- Connecticut
- ZIP
- 06256
- Coordinates
- 41.72831, -72.18837
Within ~15 km
Nearby charging
Non-networked · Available
Non-networked · Available
- Swtch Energy6 ports
SWTCH · Available
Non-networked · Available
- Columbia Town Hall6 ports
Loop · Available
- Horizons Inc HQ6 ports
Loop · Available
What kind of charging does Gates GMC Nissan offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.50 per kWh”. The site is listed as a car dealership location.
How does Gates GMC Nissan compare with other stations in North Windham?
North Windham has 4 charging stations in the DOE registry with 8 ports. Gates GMC Nissan accounts for 25% of the charging ports in North Windham. It is the only AmpUp station in North Windham. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Gates GMC Nissan?
AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 178 of those stations are in Connecticut, 10% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 24, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 8, 2026.
Frequently asked questions
How many chargers does Gates GMC Nissan have?
Gates GMC Nissan has 2 charging ports: 2 Level 2.
Does Gates GMC Nissan have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Gates GMC Nissan have?
Gates GMC Nissan has J1772 connectors.
Is charging at Gates GMC Nissan free?
Pricing as reported to the DOE registry: $0.50 per kWh.
Is Gates GMC Nissan open to the public?
Yes. Gates GMC Nissan is listed with public access, and its status is available.
Where is Gates GMC Nissan?
Gates GMC Nissan is at 143 Boston Post Rd, North Windham, CT 06256. Its coordinates are 41.72831, -72.18837.
More EV charging around North Windham
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 415744, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Gates GMC Nissan, North Windham, CT (AFDC station 415744)”, https://chargecensus.com/stations/connecticut/gates-gmc-nissan-415744 (data as of October 12, 2026).