ChargeCensus

Gates Auto Group

Temporarily unavailable

EV charging station in North Windham, Connecticut on the Blink network — 2 DC fast. US DOE AFDC station 350743.

At a glance

Gates Auto Group is a public EV charging station at 143 Boston Post Road in North Windham, Connecticut, on the Blink network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as temporarily unavailable, open since Jan 29, 2024.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID350743
NetworkBlink
StatusTemporarily unavailable (T)
AccessPublic
Open dateJan 29, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
143 Boston Post Road
City
North Windham
ZIP
6256
Coordinates
41.72831, -72.18837

Within ~15 km

Nearby charging

What kind of charging does Gates Auto Group offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Gates Auto Group compare with other stations in North Windham?

North Windham has 4 charging stations in the DOE registry with 8 ports. Gates Auto Group accounts for 25% of the charging ports in North Windham. It is the only Blink station in North Windham. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Gates Auto Group?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 62 of those stations are in Connecticut, 3% of the state's 1,807.

What does the “Temporarily unavailable” status mean?

“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 29, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Gates Auto Group have?

Gates Auto Group has 2 charging ports: 2 DC fast.

Does Gates Auto Group have DC fast charging?

Yes. The registry lists 2 DC fast ports at Gates Auto Group, with CCS connectors.

What connectors does Gates Auto Group have?

Gates Auto Group has CCS connectors.

Is Gates Auto Group open to the public?

Yes. Gates Auto Group is listed with public access, and its status is temporarily unavailable.

Where is Gates Auto Group?

Gates Auto Group is at 143 Boston Post Road, North Windham, CT 6256. Its coordinates are 41.72831, -72.18837.

More EV charging around North Windham

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 350743, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Gates Auto Group, North Windham, CT (AFDC station 350743)”, https://chargecensus.com/stations/connecticut/gates-auto-group-350743 (data as of October 12, 2026).