ChargeCensus

Farmington Plaza Site Poweral

Available

EV charging station in New Britain, Connecticut on the Red E network — 4 Level 2. US DOE AFDC station 400395.

At a glance

Farmington Plaza Site Poweral is a public EV charging station at 643 Farmington Ave in New Britain, Connecticut, on the Red E network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 20, 2025.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID400395
NetworkRed E
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateMar 20, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Red E

Operates 1,105 stations in the DOE registry — view the full network →

Location

Address
643 Farmington Ave
ZIP
06053
Coordinates
41.69547, -72.79057

Within ~15 km

Nearby charging

What kind of charging does Farmington Plaza Site Poweral offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.

How does Farmington Plaza Site Poweral compare with other stations in New Britain?

New Britain has 41 charging stations in the DOE registry with 146 ports, the 10th-most of 165 cities and towns in Connecticut. Farmington Plaza Site Poweral accounts for 3% of the charging ports in New Britain. Red E runs 4 stations in New Britain. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Farmington Plaza Site Poweral?

Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 23 of those stations are in Connecticut, 1% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 20, 2025, one of 292 stations in Connecticut with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Farmington Plaza Site Poweral have?

Farmington Plaza Site Poweral has 4 charging ports: 4 Level 2.

Does Farmington Plaza Site Poweral have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does Farmington Plaza Site Poweral have?

Farmington Plaza Site Poweral has J1772 connectors.

Is Farmington Plaza Site Poweral open to the public?

Yes. Farmington Plaza Site Poweral is listed with public access, and its status is available.

Where is Farmington Plaza Site Poweral?

Farmington Plaza Site Poweral is at 643 Farmington Ave, New Britain, CT 06053. Its coordinates are 41.69547, -72.79057.

More EV charging around New Britain

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 400395, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Farmington Plaza Site Poweral, New Britain, CT (AFDC station 400395)”, https://chargecensus.com/stations/connecticut/farmington-plaza-site-poweral-400395 (data as of October 12, 2026).