ChargeCensus

Fairfield Recreation Center

Available

EV charging station in Fairfield, Connecticut, not on a charging network — 2 Level 2. US DOE AFDC station 153622.

At a glance

Fairfield Recreation Center is a public EV charging station at 75 Mill Plain Rd in Fairfield, Connecticut, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 1, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID153622
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityRec Sports Facility
Open dateFeb 1, 2020
Last updated at sourceJun 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
75 Mill Plain Rd
ZIP
06824
Coordinates
41.14221, -73.26464

Within ~15 km

Nearby charging

What kind of charging does Fairfield Recreation Center offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a rec sports facility location.

How does Fairfield Recreation Center compare with other stations in Fairfield?

Fairfield has 33 charging stations in the DOE registry with 114 ports, the 14th-most of 165 cities and towns in Connecticut. Fairfield Recreation Center accounts for 2% of the charging ports in Fairfield. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Fairfield Recreation Center?

Fairfield Recreation Center is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 1, 2020, one of 37 stations in Connecticut with a 2020 open date. The station's record was last updated at the source on Jun 12, 2026.

Frequently asked questions

How many chargers does Fairfield Recreation Center have?

Fairfield Recreation Center has 2 charging ports: 2 Level 2.

Does Fairfield Recreation Center have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Fairfield Recreation Center have?

Fairfield Recreation Center has J1772 connectors.

Is charging at Fairfield Recreation Center free?

Pricing as reported to the DOE registry: Free.

Is Fairfield Recreation Center open to the public?

Yes. Fairfield Recreation Center is listed with public access, and its status is available.

Where is Fairfield Recreation Center?

Fairfield Recreation Center is at 75 Mill Plain Rd, Fairfield, CT 06824. Its coordinates are 41.14221, -73.26464.

More EV charging around Fairfield

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 153622, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Fairfield Recreation Center, Fairfield, CT (AFDC station 153622)”, https://chargecensus.com/stations/connecticut/fairfield-recreation-center-153622 (data as of October 12, 2026).