ChargeCensus

Espn Espn 9-2

Available

EV charging station in Bristol, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 374389.

At a glance

Espn Espn 9-2 is a public EV charging station at 899 Middle St in Bristol, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 21, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID374389
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 21, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
899 Middle St
ZIP
06010
Coordinates
41.64841, -72.90256

Within ~15 km

Nearby charging

What kind of charging does Espn Espn 9-2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Espn Espn 9-2 compare with other stations in Bristol?

Bristol has 63 charging stations in the DOE registry with 156 ports, the 3rd-most of 165 cities and towns in Connecticut. Espn Espn 9-2 accounts for 1% of the charging ports in Bristol. ChargePoint runs 42 stations in Bristol. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Espn Espn 9-2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 21, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Espn Espn 9-2 have?

Espn Espn 9-2 has 2 charging ports: 2 Level 2.

Does Espn Espn 9-2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Espn Espn 9-2 have?

Espn Espn 9-2 has J1772 connectors.

Is Espn Espn 9-2 open to the public?

Yes. Espn Espn 9-2 is listed with public access, and its status is available.

Where is Espn Espn 9-2?

Espn Espn 9-2 is at 899 Middle St, Bristol, CT 06010. Its coordinates are 41.64841, -72.90256.

More EV charging around Bristol

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 374389, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Espn Espn 9-2, Bristol, CT (AFDC station 374389)”, https://chargecensus.com/stations/connecticut/espn-espn-9-2-374389 (data as of October 12, 2026).