ChargeCensus

Earthlight Cpe250_2

Available

EV charging station in Ellington, Connecticut on the ChargePoint network — 1 DC fast. US DOE AFDC station 234719.

At a glance

Earthlight Cpe250_2 is a public EV charging station at 128 West Rd in Ellington, Connecticut, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Oct 21, 2022.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID234719
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 21, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.
  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
128 West Rd
ZIP
06029
Coordinates
41.88647, -72.46603

Within ~15 km

Nearby charging

What kind of charging does Earthlight Cpe250_2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 67% below the Connecticut average of 3.1 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.

How does Earthlight Cpe250_2 compare with other stations in Ellington?

Ellington has 10 charging stations in the DOE registry with 24 ports. Earthlight Cpe250_2 accounts for 4% of the charging ports in Ellington. ChargePoint runs 6 stations in Ellington. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Earthlight Cpe250_2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 21, 2022, one of 138 stations in Connecticut with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Earthlight Cpe250_2 have?

Earthlight Cpe250_2 has 1 charging port: 1 DC fast.

Does Earthlight Cpe250_2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Earthlight Cpe250_2, with CCS and NACS (Tesla) connectors.

What connectors does Earthlight Cpe250_2 have?

Earthlight Cpe250_2 has CCS and NACS (Tesla) connectors.

Is Earthlight Cpe250_2 open to the public?

Yes. Earthlight Cpe250_2 is listed with public access, and its status is available.

Where is Earthlight Cpe250_2?

Earthlight Cpe250_2 is at 128 West Rd, Ellington, CT 06029. Its coordinates are 41.88647, -72.46603.

More EV charging around Ellington

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 234719, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Earthlight Cpe250_2, Ellington, CT (AFDC station 234719)”, https://chargecensus.com/stations/connecticut/earthlight-cpe250-2-234719 (data as of October 12, 2026).