ChargeCensus

Ct Rail Meriden

Available

EV charging station in Meriden, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 88517.

At a glance

Ct Rail Meriden is a public EV charging station at 60 State St in Meriden, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 18, 2017.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID88517
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 18, 2017
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
60 State St
ZIP
06450
Coordinates
41.53943, -72.80078

Within ~15 km

Nearby charging

What kind of charging does Ct Rail Meriden offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Ct Rail Meriden compare with other stations in Meriden?

Meriden has 29 charging stations in the DOE registry with 92 ports, the 17th-most of 165 cities and towns in Connecticut. Ct Rail Meriden accounts for 2% of the charging ports in Meriden. ChargePoint runs 14 stations in Meriden. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Ct Rail Meriden?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 18, 2017, one of 11 stations in Connecticut with a 2017 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ct Rail Meriden have?

Ct Rail Meriden has 2 charging ports: 2 Level 2.

Does Ct Rail Meriden have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Ct Rail Meriden have?

Ct Rail Meriden has J1772 connectors.

Is Ct Rail Meriden open to the public?

Yes. Ct Rail Meriden is listed with public access, and its status is available.

Where is Ct Rail Meriden?

Ct Rail Meriden is at 60 State St, Meriden, CT 06450. Its coordinates are 41.53943, -72.80078.

More EV charging around Meriden

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 88517, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ct Rail Meriden, Meriden, CT (AFDC station 88517)”, https://chargecensus.com/stations/connecticut/ct-rail-meriden-88517 (data as of October 12, 2026).