Connecticut Department of Energy and Environmental Protection
AvailableEV charging station in Hartford, Connecticut, not on a charging network — 2 Level 2. US DOE AFDC station 46550.
At a glance
Connecticut Department of Energy and Environmental Protection is a public EV charging station at 79 Elm St in Hartford, Connecticut, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 7, 2012.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 46550 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | State government |
| Open date | Feb 7, 2012 |
| Last updated at source | Jun 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 79 Elm St
- City
- Hartford
- State
- Connecticut
- ZIP
- 06106
- Coordinates
- 41.76329, -72.67863
Within ~15 km
Nearby charging
- Collins Parking Garage40 ports
AmpUp · Available
- SWTCH Energy32 ports
SWTCH · Available
- DOT Public EV Stations30 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Destination · Available
- 1222 Stanley Street12 ports
Non-networked · Available
What kind of charging does Connecticut Department of Energy and Environmental Protection offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a state government location.
How does Connecticut Department of Energy and Environmental Protection compare with other stations in Hartford?
Hartford has 147 charging stations in the DOE registry with 483 ports, the 2nd-most of 165 cities and towns in Connecticut. Connecticut Department of Energy and Environmental Protection accounts for under 1% of the charging ports in Hartford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Connecticut Department of Energy and Environmental Protection?
Connecticut Department of Energy and Environmental Protection is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 7, 2012, one of 19 stations in Connecticut with a 2012 open date. The station's record was last updated at the source on Jun 12, 2026.
Frequently asked questions
How many chargers does Connecticut Department of Energy and Environmental Protection have?
Connecticut Department of Energy and Environmental Protection has 2 charging ports: 2 Level 2.
Does Connecticut Department of Energy and Environmental Protection have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Connecticut Department of Energy and Environmental Protection have?
Connecticut Department of Energy and Environmental Protection has J1772 connectors.
Is charging at Connecticut Department of Energy and Environmental Protection free?
Pricing as reported to the DOE registry: Free.
Is Connecticut Department of Energy and Environmental Protection open to the public?
Yes. Connecticut Department of Energy and Environmental Protection is listed with public access, and its status is available.
Where is Connecticut Department of Energy and Environmental Protection?
Connecticut Department of Energy and Environmental Protection is at 79 Elm St, Hartford, CT 06106. Its coordinates are 41.76329, -72.67863.
More EV charging around Hartford
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 46550, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Connecticut Department of Energy and Environmental Protection, Hartford, CT (AFDC station 46550)”, https://chargecensus.com/stations/connecticut/connecticut-department-of-energy-and-environmental-protection-46550 (data as of October 12, 2026).