Choate 1 And 2 Facilities
AvailableEV charging station in Wallingford, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 420852.
At a glance
Choate 1 And 2 Facilities is a public EV charging station at 35 N Elm St in Wallingford, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 26, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 420852 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 26, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 35 N Elm St
- City
- Wallingford
- State
- Connecticut
- ZIP
- 06492
- Coordinates
- 41.45477, -72.81762
Within ~15 km
Nearby charging
- Orchard Street Garage35 ports
Blink · Available
Tesla Supercharger · Available
- 1314 Quinnipiac Ave12 ports
Loop · Available
Tesla Destination · Available
- 201 Munson St #112 ports
Loop · Available
Tesla Supercharger · Available
What kind of charging does Choate 1 And 2 Facilities offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Choate 1 And 2 Facilities compare with other stations in Wallingford?
Wallingford has 20 charging stations in the DOE registry with 44 ports, the 24th-most of 165 cities and towns in Connecticut. Choate 1 And 2 Facilities accounts for 5% of the charging ports in Wallingford. ChargePoint runs 12 stations in Wallingford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Choate 1 And 2 Facilities?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 26, 2025, one of 292 stations in Connecticut with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Choate 1 And 2 Facilities have?
Choate 1 And 2 Facilities has 2 charging ports: 2 Level 2.
Does Choate 1 And 2 Facilities have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Choate 1 And 2 Facilities have?
Choate 1 And 2 Facilities has J1772 connectors.
Is Choate 1 And 2 Facilities open to the public?
Yes. Choate 1 And 2 Facilities is listed with public access, and its status is available.
Where is Choate 1 And 2 Facilities?
Choate 1 And 2 Facilities is at 35 N Elm St, Wallingford, CT 06492. Its coordinates are 41.45477, -72.81762.
More EV charging around Wallingford
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 420852, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Choate 1 And 2 Facilities, Wallingford, CT (AFDC station 420852)”, https://chargecensus.com/stations/connecticut/choate-1-and-2-facilities-420852 (data as of October 12, 2026).