Capital Regional Development Authority (CRDA)
AvailableEV charging station in Hartford, Connecticut, not on a charging network — 2 Level 2. US DOE AFDC station 62488.
At a glance
Capital Regional Development Authority (CRDA) is a public EV charging station at 105 Columbus Blvd in Hartford, Connecticut, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 1, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 62488 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Parking garage |
| Open date | Sep 1, 2024 |
| Last updated at source | Jun 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.45 per kWh
Location
- Address
- 105 Columbus Blvd
- City
- Hartford
- State
- Connecticut
- ZIP
- 06103
- Coordinates
- 41.76329, -72.67016
Within ~15 km
Nearby charging
- Collins Parking Garage40 ports
AmpUp · Available
- SWTCH Energy32 ports
SWTCH · Available
- DOT Public EV Stations30 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Destination · Available
- 1222 Stanley Street12 ports
Non-networked · Available
What kind of charging does Capital Regional Development Authority (CRDA) offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.45 per kWh”. The site is listed as a parking garage location. It is flagged as workplace charging.
How does Capital Regional Development Authority (CRDA) compare with other stations in Hartford?
Hartford has 147 charging stations in the DOE registry with 483 ports, the 2nd-most of 165 cities and towns in Connecticut. Capital Regional Development Authority (CRDA) accounts for under 1% of the charging ports in Hartford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Capital Regional Development Authority (CRDA)?
Capital Regional Development Authority (CRDA) is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 1, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Jun 12, 2026.
Frequently asked questions
How many chargers does Capital Regional Development Authority (CRDA) have?
Capital Regional Development Authority (CRDA) has 2 charging ports: 2 Level 2.
Does Capital Regional Development Authority (CRDA) have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Capital Regional Development Authority (CRDA) have?
Capital Regional Development Authority (CRDA) has J1772 connectors.
Is charging at Capital Regional Development Authority (CRDA) free?
Pricing as reported to the DOE registry: $0.45 per kWh.
Is Capital Regional Development Authority (CRDA) open to the public?
Yes. Capital Regional Development Authority (CRDA) is listed with public access, and its status is available.
Where is Capital Regional Development Authority (CRDA)?
Capital Regional Development Authority (CRDA) is at 105 Columbus Blvd, Hartford, CT 06103. Its coordinates are 41.76329, -72.67016.
More EV charging around Hartford
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 62488, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Capital Regional Development Authority (CRDA), Hartford, CT (AFDC station 62488)”, https://chargecensus.com/stations/connecticut/capital-regional-development-authority-crda-62488 (data as of October 12, 2026).