ChargeCensus

Bruce Bennett Nissan

Available

EV charging station in Wilton, Connecticut, not on a charging network — 1 DC fast · 1 Level 2. US DOE AFDC station 44464.

At a glance

Bruce Bennett Nissan is a public EV charging station at 978 Danbury Rd in Wilton, Connecticut, not attached to a charging network. It has 2 charging ports (1 DC fast · 1 Level 2) with CHAdeMO and J1772 connectors. The US DOE registry lists it as available, open since Nov 30, 2011.

Total ports
2
DC fast
1
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID44464
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityCar dealership
Open dateNov 30, 2011
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
978 Danbury Rd
City
Wilton
ZIP
06897
Coordinates
41.25905, -73.43561

Within ~15 km

Nearby charging

What kind of charging does Bruce Bennett Nissan offer?

Of its 2 ports, 1 is DC fast and 1 is Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector. The site is listed as a car dealership location.

How does Bruce Bennett Nissan compare with other stations in Wilton?

Wilton has 8 charging stations in the DOE registry with 14 ports. Bruce Bennett Nissan accounts for 14% of the charging ports in Wilton. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Bruce Bennett Nissan?

Bruce Bennett Nissan is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 30, 2011, one of 17 stations in Connecticut with a 2011 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Bruce Bennett Nissan have?

Bruce Bennett Nissan has 2 charging ports: 1 DC fast · 1 Level 2.

Does Bruce Bennett Nissan have DC fast charging?

Yes. The registry lists 1 DC fast port at Bruce Bennett Nissan, with CHAdeMO connectors.

What connectors does Bruce Bennett Nissan have?

Bruce Bennett Nissan has CHAdeMO and J1772 connectors.

Is Bruce Bennett Nissan open to the public?

Yes. Bruce Bennett Nissan is listed with public access, and its status is available.

Where is Bruce Bennett Nissan?

Bruce Bennett Nissan is at 978 Danbury Rd, Wilton, CT 06897. Its coordinates are 41.25905, -73.43561.

More EV charging around Wilton

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 44464, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Bruce Bennett Nissan, Wilton, CT (AFDC station 44464)”, https://chargecensus.com/stations/connecticut/bruce-bennett-nissan-44464 (data as of October 12, 2026).