BOE Administration Bldg
AvailableEV charging station in Coventry, Connecticut on the FLO network — 2 Level 2. US DOE AFDC station 332069.
At a glance
BOE Administration Bldg is a public EV charging station at 1700 Main St in Coventry, Connecticut, on the FLO network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 11, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 332069 |
| Network | FLO |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 11, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1700 Main St
- City
- Coventry
- State
- Connecticut
- ZIP
- 06238
- Coordinates
- 41.77939, -72.31040
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Non-networked · Available
Non-networked · Available
- Swtch Energy6 ports
SWTCH · Available
- Columbia Town Hall6 ports
Loop · Available
Non-networked · Available
What kind of charging does BOE Administration Bldg offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does BOE Administration Bldg compare with other stations in Coventry?
Coventry has 10 charging stations in the DOE registry with 20 ports. BOE Administration Bldg accounts for 10% of the charging ports in Coventry. FLO runs 9 stations in Coventry. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates BOE Administration Bldg?
FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 89 of those stations are in Connecticut, 5% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 11, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does BOE Administration Bldg have?
BOE Administration Bldg has 2 charging ports: 2 Level 2.
Does BOE Administration Bldg have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does BOE Administration Bldg have?
BOE Administration Bldg has J1772 connectors.
Is BOE Administration Bldg open to the public?
Yes. BOE Administration Bldg is listed with public access, and its status is available.
Where is BOE Administration Bldg?
BOE Administration Bldg is at 1700 Main St, Coventry, CT 06238. Its coordinates are 41.77939, -72.31040.
More EV charging around Coventry
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 332069, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “BOE Administration Bldg, Coventry, CT (AFDC station 332069)”, https://chargecensus.com/stations/connecticut/boe-administration-bldg-332069 (data as of October 12, 2026).