ChargeCensus

Baybrook Remodelers

Available

EV charging station in West Haven, Connecticut on the AmpUp network — 2 Level 2. US DOE AFDC station 415874.

At a glance

Baybrook Remodelers is a public EV charging station at 790 Boston Post Rd in West Haven, Connecticut, on the AmpUp network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 19, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID415874
NetworkAmpUp
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateJul 19, 2024
Last updated at sourceOct 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.40 per kWh

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
790 Boston Post Rd
ZIP
06516
Coordinates
41.28646, -72.97474

Within ~15 km

Nearby charging

What kind of charging does Baybrook Remodelers offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.40 per kWh”. The site is listed as a other location.

How does Baybrook Remodelers compare with other stations in West Haven?

West Haven has 14 charging stations in the DOE registry with 37 ports. Baybrook Remodelers accounts for 5% of the charging ports in West Haven. AmpUp runs 4 stations in West Haven. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Baybrook Remodelers?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 178 of those stations are in Connecticut, 10% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 19, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 2, 2026.

Frequently asked questions

How many chargers does Baybrook Remodelers have?

Baybrook Remodelers has 2 charging ports: 2 Level 2.

Does Baybrook Remodelers have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Baybrook Remodelers have?

Baybrook Remodelers has J1772 connectors.

Is charging at Baybrook Remodelers free?

Pricing as reported to the DOE registry: $0.40 per kWh.

Is Baybrook Remodelers open to the public?

Yes. Baybrook Remodelers is listed with public access, and its status is available.

Where is Baybrook Remodelers?

Baybrook Remodelers is at 790 Boston Post Rd, West Haven, CT 06516. Its coordinates are 41.28646, -72.97474.

More EV charging around West Haven

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 415874, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Baybrook Remodelers, West Haven, CT (AFDC station 415874)”, https://chargecensus.com/stations/connecticut/baybrook-remodelers-415874 (data as of October 12, 2026).