ChargeCensus

Asnuntuck Community College

Available

EV charging station in Enfield, Connecticut, not on a charging network — 3 Level 2. US DOE AFDC station 70500.

At a glance

Asnuntuck Community College is a public EV charging station at 170 Elm St in Enfield, Connecticut, not attached to a charging network. It has 3 charging ports (3 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 1, 2015.

Total ports
3
DC fast
0
Level 2
3
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID70500
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityCollege campus
Open dateAug 1, 2015
Last updated at sourceJun 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
170 Elm St
ZIP
06082
Coordinates
42.00003, -72.56978

Within ~15 km

Nearby charging

What kind of charging does Asnuntuck Community College offer?

Of its 3 ports, 3 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is roughly in line with the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a college campus location.

How does Asnuntuck Community College compare with other stations in Enfield?

Enfield has 12 charging stations in the DOE registry with 50 ports. Asnuntuck Community College accounts for 6% of the charging ports in Enfield. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Asnuntuck Community College?

Asnuntuck Community College is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 1, 2015, one of 30 stations in Connecticut with a 2015 open date. The station's record was last updated at the source on Jun 12, 2026.

Frequently asked questions

How many chargers does Asnuntuck Community College have?

Asnuntuck Community College has 3 charging ports: 3 Level 2.

Does Asnuntuck Community College have DC fast charging?

No. The registry lists no DC fast ports here; its 3 ports are all Level 2.

What connectors does Asnuntuck Community College have?

Asnuntuck Community College has J1772 connectors.

Is charging at Asnuntuck Community College free?

Pricing as reported to the DOE registry: Free.

Is Asnuntuck Community College open to the public?

Yes. Asnuntuck Community College is listed with public access, and its status is available.

Where is Asnuntuck Community College?

Asnuntuck Community College is at 170 Elm St, Enfield, CT 06082. Its coordinates are 42.00003, -72.56978.

More EV charging around Enfield

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 70500, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Asnuntuck Community College, Enfield, CT (AFDC station 70500)”, https://chargecensus.com/stations/connecticut/asnuntuck-community-college-70500 (data as of October 12, 2026).